Representative Projects: Stormwater
Madera
Update water system planning and design criteria.
- Develop an EPS hydraulic model in Innovyze’s InfoSWMM and based on the most current GIS data.
- Worked in conjunction with Hydmet, Inc to develop hydrologic models based on existing and future land use in a customized model working in HEC-1.
- Evaluate the capacity of the storm drainage facilities to service existing users.
- Perform storage capacity analysis for existing retention basins and recommend improvements.
- Recommend improvements necessary to mitigate existing deficiencies and to service future growth.
- Recommend improvements to reduce dependence on local irrigation canals for runoff disposal.
- Develop a Capital Improvement Program with a short-term, intermediate-term and long-term phasing.
- Perform cost sharing analysis for each recommended project between existing users and future developments.
- Coordinate this plan with the 2013 recycled water system feasibility study, 2013 sewer system master plan, and 2013 water system master plan being completed concurrently by Akel Engineering Group.
- Prepare master plan report.
Yakima
Update water system planning and design criteria.
- Develop an EPS hydraulic model in Innovyze’s InfoSWMM and based on the most current GIS data.
- Worked in conjunction with Hydmet, Inc to develop hydrologic models based on existing and future land use in a customized model working in HEC-1.
- Evaluate the capacity of the dual system storm drainage facilities that services existing users.
- Recommend improvements necessary to mitigate existing deficiencies.
- Recommend improvements to reduce dependence on local groundwater drainage for runoff disposal.
- Evaluate cost alternatives of using localized retention versus regional retention, and the benefits of both for meeting County and State water quality objectives.
- Develop a Capital Improvement Program with a short-term, intermediate-term and long-term phasing.
- Perform cost sharing analysis for each recommended project between existing users and future developments.
- Coordinate this plan with the 2013 wastewater collection system master plan being completed concurrently by Akel Engineering Group.
- Prepare master plan report.